Be informed on what's happening around you in 2018.

City of Perth Surveillance Centre – 9461 6611

Week Ending 20 June 2018

Department of Mines and Petroleum – Schedule of Approved Fireworks

http://www.dmp.wa.gov.au/Schedule-of-fireworks-events-3205.aspx

Events

Farmers Market 
Date: Weekly on a Saturday 
Location: Perth City Farm 
Time: 8:00 to 12:00

Perth Home‐Grown Markets 
Date: Weekly on a Sunday 
Location: Murray Street Mall 
Time: 11:00 to 16:00

T20 Cricket 
Date: Every Sunday from 8 April 2018 until 25 November 2018 
Location: Wellington Square 
Time: 10:00– 16:30
Attendees: 50 
Contact: Mr S Khan – 0470 543 750

MND Street Appeal 
Date: Friday 15 June 2018 
Location: Murray Street Mall Kiosk Site 
Time: 07:00 – 17:00 
Contact: Sarah Wiley 0430 984 883 

Operation Make-A-Wish  
Date: Friday 15 June 2018 
Location: Murray Street Mall CommBank site 
Time: 0700 – 10:00
Contact: Lizzy Alderson 0431 858 990 

Medicins Sans Frontiers
Date:- Monday 18- Friday 22 June 2018
Location: CBD
Time:- 09:00 – 17:00
Contact:- Emily Anderson –0428 6646 869

2018 Brookfield Winter Lights Media Launch 
Date:- Wednesday 20 June 2018
Location: Print Hall, Brookfield Plaza a 
Time:- 18:00 – 21:00
Attendees:- 200
Contact:- Ms A Britten 0400 570 530    

Works:

34 East Parade, East Perth
Date: 01/06/2017 - 30/06/2018
Time: 0700 - 1700
Type of Works: Footpath closure for loading and unloading zone and temporary fencing.
Contact: Psaros Reatly Ph:  0499 799 844

74-78 Stirling Street, Northtbridge
Date: 19/07/2017 - 16/08/2018
Time: 0700 - 1900
Type of Works: Footpath closure for delivery trucks entering and exiting site.
Contact: BGC Construction Pty Ltd Ph:  0403 257 793

Corner of Beaufort Street and James Street Mall Intersection, Perth
Date: 26/09/2017 - 20/12/2019
Time: 0700 - 1730
Type of Works: Footpath closure to remove one of the street signs on Beaufort Street and extend the cross-over.
Contact: Multiplex Constructions Pty Ltd Ph:  0457 763 398

Northbridge, East Perth, City West, Perth CBD
Date: 26/09/2017 - 25/09/2018
Time: 0000 - 2359
Type of Works: Footpath and road lane closure for street lighting and electrical maintenance.
Contact: EOS Electrical Ph:  0407 922 803
Out of hours noise approval has been given.

East Perth and Crawley
Date: 10/10/2017 - 10/10/2018
Time: 0000 - 2400
Type of Works: Footpath closure for streetlight globe replacements.
Contact: Sunrun Services Ph:  0428 030 952
Out of hours noise approval has been given.

Various location in West Perth
Date: 17/01/2018 - 12/12/2018
Time: 0700 - 1430
Type of Works: Verge closure for garden maintenance to round abouts and median islands.
Contact: City of Perth Ph:  0417 955 314

State Theatre Centre of WA - Roe Street East of William Street, Perth
Date: 30/01/2018 - 30/06/2018
Time: 0700 - 1900
Type of Works: Footpath closure to allow vehicle access to State Theatre Centre loading docks.
Contact: State Theatre Centre of WA Ph:  0429 365 838

Thomas Street and Winthrop Avenue between Kings Park Road and Stirling Highway, Perth
Date: 20/02/2018 - 11/12/2018
Time: 1000 - 1400
Type of Works: Verge closure for garden maintenance to median island.
Contact: City of Perth Ph:  0417 955 314

Hay Street and Murray Street Malls, Perth
Date: 26/02/2018 - 21/12/2018
Time: 0700 - 1000
Type of Works: Garden bed and planter box maintenance, including watering.
Contact: City of Perth Ph:  0418 918 668

18 Prowse Street, West Perth
Date: 27/02/2018 - 27/07/2018
Time: 0700 - 1800
Type of Works: Footpath closure for temporary fencing.
Contact: Interite Healthcare Interiors Ph:  0432 403 773

Wellington Street between Havelock Street and George Street, Perth
Date: 27/02/2018 - 22/08/2018
Time: 1000 - 1430
Type of Works: Two lane road closure for garden maintenance to median island.
Contact: City of Perth Ph:  0417 955 314

William Street between James Street and Francis Street, Northbridge
Date: 14/03/2018 - 30/11/2018
Time: 0700 - 1900
Type of Works: Footpath and verge closure for partial demolition of brickwork, concrete basement slab and basement excavation.
Contact: Built Pty Ltd Ph:  0451 054 441

Lot 10 Barrack Square, Elizabeth Quay
Date: 15/03/2018 - 01/03/2019
Time: 0000 - 2400
Type of Works: Footpath Closure as part of the workzone permit in Barrack Square.
Contact: ProBuild Ph:  0479 095 137

Como The Treasury Hotel - Barrack Street, St Georges Terrace and Cathedral Avenue, Perth
Date: 31/03/2018 - 30/09/2018
Time: 0500 - 1700
Type of Works: Window Cleaning using water fed poles - no machines required.
Contact: Window Clean Ph:  0421 330 111

All parklands within the City boundary
Date: 06/04/2018 - 05/04/2019
Time: 0730 - 1900
Type of Works: Use of drone to inspect tree canopies to prevent vehicle damage to parklands.
Contact: City of Perth Ph: 08 9461 3234 

2 Park Road, Crawley
Date: 09/04/2018 - 16/04/2019
Time: 0700 - 1900
Type of Works: Verge closure to remove kerbing.
Contact: EMCO Building Ph:  0450 481 895

City of Perth Library - Greenwall
Date: 11/04/2018 - 12/12/2018
Time: 0700 - 0900
Type of Works: Footpath closure to allow use of an EWP within the property boundary to access and maintain the library greenwall.
Contact: City of Perth Ph: 08 9461 3234 

Kings Park Road between Havelock Street and Thomas Street, Perth
Date: 19/04/2018 - 28/06/2018
Time: 0700 - 1430
Type of Works: Mowing and garden maintenance to median island.
Contact: City of Perth Ph:  0417 955 314

HBF Building - Telethon Avenue and Wellington Street, Perth
Date: 21/04/2018 - 22/06/2018
Time: 0700 - 1700
Type of Works: Footpath and road lane closure to inspect and carry out minor repair works on all facades of the building.
Contact: Ash Traffic Consultancy Pty Ltd Ph:  0428 924 608

Riverwall - Mounts Bay Road, Perth
Date: 26/04/2018 - 30/06/2018
Time: 0700 - 1700
Type of Works: Verge closure for general maintenance repairs to the river wall structures.
Contact: MMM WA Pty Ltd Ph:  0427 437 173

Riverwall - Riverside Drive, Perth
Date: 26/04/2018 - 30/06/2018
Time: 0700 - 1700
Type of Works: Footpath closure for general maintenance repairs to the river wall structure.
Contact: MMM WA Pty Ltd Ph:  0427 437 173

225 St George's Terrace, Perth
Date: 26/04/2018 - 30/06/2018
Time: 0700 - 1900
Type of Works: Footpath and verge closure for waterproofing paving, steel structure and general landscaping.
Contact: LD Total Ph:  0420 487 871

Riverside Drive - Barrack Street to Plain Street, Perth
Date: 26/04/2018 - 15/11/2018
Time: 0930 - 1500
Type of Works: Road lane closure for median strip garden maintenance.
Contact: City of Perth Ph:  0418 918 668

Various locations in East Perth
Date: 07/05/2018 - 07/08/2018
Time: 0700 - 1700
Type of Works: Footpath and verge closure for installation of new NBN assets.
Contact: Fulton Hogan Ph:  0408 428 186

45 Royal Street, East Perth
Date: 09/05/2018 - 25/06/2018
Time: 0730 - 1600
Type of Works: Footpath closure to prepare and paint exterior of building.
Contact: Pedrini Painting Ph:  0421 136 245

Albert Facey House, Wellington Street, Perth
Date: 10/05/2018 - 18/06/2018
Time: 2100 - 0600
Type of Works: Footpath closure for ground works.
Contact: Buss Group Ph:  0408 830 887

Francis Street between Beaufort Street and Museum Street and Beaufort Street to James Street intersection, Perth
Date: 13/05/2018 - 13/06/2018
Time: 0700 - 1900
Type of Works: Footpath closure for trucks entering and exiting construction site.
Contact: Multiplex Constructions Pty Ltd Ph:  0457 763 398

East Parade and Kensington Street, East Perth
Date: 13/05/2018 - 30/06/2018
Time: 0700 - 2400
Type of Works: Footpath and road lane closure for traffic signals upgrades.
Contact: Downer Mouchel Electrical Ph:  0447 985 847
Out of hours noise approval has been approved.

Brass Monkey - 215 William Street, Northbridge
Date: 14/05/2018 - 07/07/2018
Time: 0700 - 1800
Type of Works: Footpath closure for barricading and signage.
Contact: Riverslea Construction Ph:  0456 157 818

Thomas Street before Aberdare Road, Winthrop Avenue before Hardy Road, Corner Monash Avenue and Hampden Road, Perth
Date: 14/05/2018 - 25/06/2018
Time: 0800 - 1700
Type of Works: Verge closure for 3 x LED sign.
Contact: QEII Medical Centre Trust Ph:  0422 819 897

Corner of Mounts Bay Road and Hackett Drive, Crawley
Date: 14/05/2018 - 20/06/2018
Time: 0700 - 1700
Type of Works: Footpath closure to use EWP to clean stone, planter boxes and green wall.
Contact: Jaxon Construction Pty Ltd Ph:  0437 879 292

North Metropolitan TAFE Campus - 20 Francis Street, Northbridge
Date: 17/05/2018 - 16/06/2018
Time: 0700 - 1700
Type of Works: Footpath closure for works include screeding, the installation of a new waterproof membrane and paving system.
Contact: Duratec Aust Ph:  0437 143 010

89-95 Stirling Street, between James Street and Aberdeen Street, Perth
Date: 21/05/2018 - 20/06/2018
Time: 0700 - 1900
Type of Works: Footpath, verge and road lane closure for the lifting of precast panels.
Contact: BGC Construction Pty Ltd Ph:  0401 951 496

27 St Georges Terrace, St Georges Terrace and Adelaide Terrace to Bennett Street, Perth
Date: 21/05/2018 - 30/06/2018
Time: 0700 - 1700
Type of Works: Footpath closure for installation of pit and CCTV poles.
Contact: C & M Communications Maintenance Ph:  0423 176 055

60-66 Roe Street, Northbridge
Date: 21/05/2018 - 15/06/2018
Time: 0700 - 1700
Type of Works: Footpath closure for excavation to install new grease trap.
Contact: Perth Plumbers Ph:  0414 528 276

69 Outram Street, West Perth
Date: 21/05/2018 - 20/06/2018
Time: 0700 - 1700
Type of Works: Footpath closure for using EWP to fix structural steel.
Contact: Toh Construction Pty Ltd Ph:  0421 998 834

319-335 Wellington Street, Perth
Date: 22/05/2018 - 22/06/2018
Time: 0700 - 1900
Type of Works: Road lane closure for construction works.
Contact: Built Pty Ltd Ph:  0447 544 987

Campus Perth Site - 202 Pier Street, Perth
Date: 22/05/2018 - 25/06/2018
Time: 0700 - 1700
Type of Works: Footpath closure for trucks to unload materials within the site boundary.
Contact: Broad Ph:  0428 979 730

Various locations in Perth City
Date: 23/05/2018 - 30/06/2018
Time: 0700 - 1500
Type of Works: Footpath closure for new nbn cables and installation of facilities.
Contact: Telstra Ph:  0476 855 030

Roe Street and corner of Fitzgerald Street, Northbridge
Date: 23/05/2018 - 15/06/2018
Time: 0700 - 1700
Type of Works: Verge closure to upgrade footpath and driveways.
Contact: Access Paving Ph:  0420 944 312

74-78 Stirling Street, Northtbridge
Date: 23/05/2018 - 22/06/2018
Time: 0700 - 1900
Type of Works: Footpath and verge closure for the lifting of concrete panels over footpath, concrete pumping and the construction of temporary crossover.
Contact: BGC Construction Pty Ltd Ph:  0413 153 514

Trinity Arcade between Dome Cafe and Hay Street Mall, Perth
Date: 24/05/2018 - 23/06/2018
Time: 2100 - 0600
Type of Works: Verge closure for re-works to existing paving.
Contact: Go 2 Group Ph:  0417 663 339
Out of hours noise approval has been approved.

Various locations in Perth City
Date: 25/05/2018 - 24/06/2018
Time: 1700 - 0500
Type of Works: Footpath and road lane closure for installation of Teleco Assets for NBN
Contact: Fulton Hogan Ph:  0408 428 186
Out of hours noise approval has been approved.

Corner of Mounts Bay Road and Hackett Drive, Crawley
Date: 25/05/2018 - 22/06/2018
Time: 0700 - 1700
Type of Works: Footpath closure for scaffolding removal and realignment of footpath.
Contact: Jaxon Construction Pty Ltd Ph:  0437 879 292

45 Francis Street, Northbridge
Date: 26/05/2018 - 30/06/2018
Time: 0700 - 1700
Type of Works: Footpath closure for construction site.
Contact: Workforce Road Services Ph:  0400 661 326

Hackett Drive to Australia II Drive, Perth
Date: 26/05/2018 - 25/06/2018
Time: 0700 - 1800
Type of Works: Road clane closure for installation of NBN communications conduit along Hackett Drive.
Contact: Fulton Hogan Ph:  0428 082 348

St Georges Terrace intersection of Milligan Street to Plain Street, Mounts Bay Road from Sulivans Hotel to William Street, Perth
Date: 26/05/2018 - 26/06/2018
Time: 0700 - 1400
Type of Works: Road lane closure for cleaning of all gullies and drains.
Contact: Drainflow Services Pty Ltd Ph:  0411 512 563

Forrest Place -  Murray Street, Perth
Date: 26/05/2018 - 24/06/2018
Time: 0700 - 1900
Type of Works: Footpath closure for the installation of signage to hoarding panels in the Forrest Chase malls and Murray 
Street Malls.
Contact: Discus Digital Print Ph:  0430 573 163

515 Wellington Street, Perth
Date: 30/05/2018 - 30/06/2018
Time: 0700 - 1700
Type of Works: Footpath, verge and road lane closue for concrete works for basement construction.
Contact: ATM Ph: 08 9274 6300 

82 Royal Street, East Perth
Date: 30/05/2018 - 06/07/2018
Time: 0700 - 1530
Type of Works: Footpath closure for painting.
Contact: Perrott Painting Ph:  0437 829 646

Hay Street, Perth
Date: 30/05/2018 - 15/06/2018
Time: 0700 - 1700
Type of Works: Footpath closure for installing footing.
Contact: Access Paving Ph:  0420 944 312

Nile Street, East Perth
Date: 30/05/2018 - 27/06/2018
Time: 0700 - 1700
Type of Works: Verge closure for installing path.
Contact: Access Paving Ph:  0420 944 312

Forrest Place - Wellington Street, Perth
Date: 30/05/2018 - 29/06/2018
Time: 2100 - 0500
Type of Works: Demolition works including loading out bins and crane works.
Contact: Lendlease Ph:  0429 625 597
Out of hours noise approval has been approved.

35-37 Bronte Street, East Perth
Date: 31/05/2018 - 30/06/2018
Time: 0700 - 1700
Type of Works: Footpath and road lane closure for construction works.
Contact: Jaxon Construction Pty Ltd Ph:  0417 917 202

Campus Perth Site- 80 Stirling Street and Pier Street, Perth
Date: 01/06/2018 - 30/06/2018
Time: 0700 - 1700
Type of Works: Footpath closure for trucks entering and exiting site.
Contact: Broad Ph:  0428 979 730

Kensington Street, East Perth
Date: 01/06/2018 - 30/06/2018
Time: 0700 - 1700
Type of Works: Road lane closure for material delivery, painting worksand concrete pumping.
Contact: Psaros Reatly Ph:  0499 799 844

Nelson Crescent, East Perth
Date: 01/06/2018 - 22/06/2018
Time: 0700 - 1900
Type of Works: Footpath closure to enable safe discharge to sewer.
Contact: Georgiou Group Ph:  0407 471 591

374-396 Murray Street and 609 Wellington Street, Perth
Date: 01/06/2018 - 02/07/2018
Time: 0700 - 1900
Type of Works: Footpath and verge closure for construction works.
Contact: Probuild Constructions Ph:  0437 009 060

Forrest Place Redevelopment - Wellington Street, Perth
Date: 01/06/2018 - 29/06/2018
Time: 2100 - 0500
Type of Works: Footpath closure for hand rail fixing works with the use of EWP.
Contact: Lendlease Ph:  0429 625 597

319-335 Wellington Street, Perth
Date: 01/06/2018 - 30/06/2018
Time: 0700 - 1700
Type of Works: Footpath closure for activities such as loading and unloading of materials and equipment, and material/ vehicle movement around site and through gantry gates.
Contact: Built Pty Ltd Ph:  0447 544 987

168 Broadway, Crawley
Date: 01/06/2018 - 15/06/2018
Time: 0800 - 1600
Type of Works: Footpath and verge closure for bore shots along communications alignment.
Contact: Fulton Hogan Ph:  0437 851 223

HBF - Wellington Steet, Telethon Avenue, Perth
Date: 02/06/2018 - 17/06/2018
Time: 0700 - 1700
Type of Works: Footpath and road lane closure for building inspection.
Contact: Metro Traffic Planning Ph:  0449 832 348

Forrest Place redevelopment - Murray Street, Perth
Date: 03/06/2018 - 01/07/2018
Time: 0900 - 0530
Type of Works: Footpath closure for demolition works including the load out of skip bins and crane works.
Contact: Lendlease Ph:  0429 625 597
Out of hours noise approval has been approved.

Mercedes College, Hay Street, Perth
Date: 04/06/2018 - 15/06/2018
Time: 0700 - 1700
Type of Works: Footpath closure for the installation of street furniture.
Contact: Lightning Brick Pavers Ph:  0438 800 582

Perth Town Hall, Barrack Street, Perth
Date: 04/06/2018 - 30/06/2018
Time: 0700 - 1600
Type of Works: Footpath closure for installation of electronic sign.
Contact: EOS Electrical Ph:  0407 922 803

900 Hay Street, Perth
Date: 04/06/2018 - 03/07/2018
Time: 0700 - 1900
Type of Works: Footpath and road lance closure for truck access to site.
Contact: Warp Traffic Management Ph: 08 9493 8700 

Mounts Bay Road between Hackett Drive and Crawley Avenue, Perth
Date: 05/06/2018 - 15/06/2018
Time: 0700 - 1730
Type of Works: Footpath closure for directional drilling and trenching and backfill and reinstate site once works have been completed.
Contact: Cable Layers Australia Pty Ltd Ph: 08 9414 8113 

1 Nelson Avenue, East Perth
Date: 05/06/2018 - 16/06/2018
Time: 0700 - 1730
Type of Works: Footpath closure to install uni pillar and drill cable.
Contact: Cable Layers Australia Pty Ltd Ph: 08 9414 8113 

Forrest Place Redevelopment - Murray Street, Perth
Date: 05/06/2018 - 03/07/2018
Time: 2100 - 0500
Type of Works: Footpath closure for demolition work.
Contact: Lendlease Ph:  0417 136 315
Out of hours noise approval has been approved.

130 Royal Street, East Perth
Date: 05/06/2018 - 22/06/2018
Time: 0700 - 1700
Type of Works: Footpath closure for replacement of facia.
Contact: George Fielder Ph:  0435 718 974

47 Lake Street, Northbridge
Date: 05/06/2018 - 31/07/2018
Time: 0700 - 1700
Type of Works: Skip bin for removal stuffs.
Contact: Louder Louder Ph:  0402 717 555

Bennett Street, Plain Street and Wittenoom Street, Perth
Date: 05/06/2018 - 15/06/2018
Time: 0700 - 1700
Type of Works: Footpath closure for installation of pit and pipe for CCtV Cameras.
Contact: C & M Communications Maintenance Ph:  0423 176 055

70 Mount Street. Perth
Date: 06/06/2018 - 22/06/2018
Time: 0700 - 1730
Type of Works: Footpath and road lane closure for crane lift.
Contact: Workforce Road Services Ph:  0407 480 277

150 Broadway, Crawley
Date: 06/06/2018 - 20/06/2018
Time: 0700 - 1500
Type of Works: Footpath closure to reinstate wall with paving.
Contact: Pindan Ph:  0400 682 706

1 Barrack Square, Perth
Date: 07/06/2018 - 31/07/2018
Time: 0700 - 1700
Type of Works: Footpath Closure for construction works.
Contact: SKS Builders Pty Ltd Ph:  0450 036 957

525 Wellington Street, East Perth
Date: 07/06/2018 - 22/06/2018
Time: 2230 - 0500
Type of Works: Footpath and road closure for loading out of rubble.
Contact: Built Pty Ltd Ph:  0432 605 245
Out of hours noise approval has been approved.

200 James Street, Northbridge
Date: 07/06/2018 - 13/07/2018
Time: 0700 - 1700
Type of Works: Footpath closure to remove and replace steps.
Contact: Access Paving Ph:  0420 944 312

His Majesty's Theatre, King Street, Perth
Date: 07/06/2018 - 30/06/2018
Time: 0800 - 2330
Type of Works: Footpath and verge closure for loading and unloading trucks.
Contact: His Majesty's Theatre Ph:  0412 115 175
Out of hours noise approval has been approved.

37 Mount Street West Perth
Date: 07/06/2018 - 05/07/2018
Time: 0700 - 1700
Type of Works: Foot path and verge closure for building construction.
Contact: Kwik Logistics Ph:  0427 654 062

18 Stirling Street, Perth
Date: 07/06/2018 - 09/07/2018
Time: 0600 - 1800
Type of Works: Foothpath closure for filming.
Contact: Matchbox Ph: 08 9446 8138 

18 The Esplanade, Perth
Date: 08/06/2018 - 15/06/2018
Time: 0700 - 1700
Type of Works: Footpath closure for loading out demo rubble.
Contact: Brajkovich Demolition & Salvage Ph:  0400 708 431

20 Royal Street, East Perth
Date: 08/06/2018 - 15/06/2018
Time: 0900 - 1700
Type of Works: Car bay for skip bin location.
Contact: Customised Projects Ph:  0468 517 763

Hay Street, Perth
Date: 08/06/2018 - 22/06/2018
Time: 0700 - 1530
Type of Works: Footpath closure for lifting material to rooftop.
Contact: Deep Green Landscaping Ph: 08 9242 2299 

Murray Street, Perth
Date: 08/06/2018 - 19/06/2018
Time: 0700 - 1800
Type of Works: Footpath closure to upgrade telstra pit and conduit, fibre optic cable haul and splicing.
Contact: AAG Communications Ph:  0423 604 088

125 Fairway, Crawley
Date: 08/06/2018 - 07/07/2018
Time: 0700 - 1700
Type of Works: Verge closure for concrete delivery.
Contact: City of Perth Ph:  0421 643 089

98 - 100 James Street, Northbridge
Date: 09/06/2018 - 08/07/2018
Time: 0700 - 1700
Type of Works: Footpath and road lane clsoure for loading and unloading of materials and equipment.
Contact: SKS Group Ph: 08 9470 4829 

74 Mounts Bay Road, Perth
Date: 09/06/2018 - 16/06/2018
Time: 0700 - 1600
Type of Works: Footpath and road lane closure for reinstating concrete driveway.
Contact: Site EX Pty Ltd Ph:  0448 844 204

Raine Square - William Street and Wellington Street, Perth
Date: 10/06/2018 - 16/06/2018
Time: 0900 - 1500
Type of Works: Footpath closure for dropping of High level scaffold.
Contact: Built Pty Ltd Ph:  0432 605 245

Grand Lane, Perth
Date: 11/06/2018 - 24/06/2018
Time: 0700 - 1900
Type of Works: Footpath closure for forming new doors and high level window penetrations.
Contact: Lendlease Ph:  0429 625 597

Old Swan Brewery, 173 Mounts Bay Road, Perth
Date: 11/06/2018 - 15/06/2018
Time: 0700 - 17:00
Type of Works: Footpath closure for washing windows using an E.W.P.
Contact: Blue Sky Window Cleaning Aust Ph:  0418 936 639

William Street, Perth from James Street to Roe Street, Perth
Date: 11/06/2018 - 16/06/2018
Time: 0700 - 1730
Type of Works: Footpath closure to reinstate footpath.
Contact: Cable Layers Australia Pty Ltd Ph: 08 9414 8113 

Wellington Street, Perth
Date: 11/06/2018 - 22/06/2018
Time: 0900 - 1500
Type of Works: Footpath closure to apply safety line along  path kerbing.
Contact: Workzone Pty Ltd Ph:  0418 436 372

100 Stirling Street, Perth
Date: 11/06/2018 - 15/06/2018
Time: 0700 - 1700
Type of Works: Footpath closure to replace fascia.
Contact: Ironclad Ph:  0476 232 507

Hill Street between Goderich Street and Hay Street to 
Hay Street between Bennett Street and Victoria Avenue, Perth
Date: 11/06/2018 - 14/06/2018
Time: 0700 - 1700
Type of Works: Footpath closure for slot trenching.
Contact: Subtera Ph:  0409 402 315

Roe Street between Stirling Street and Fitzgerald Street, Perth
Date: 11/06/2018 - 11/07/2018
Time: 0700 - 1900
Type of Works: Road lane closure to install watermain.
Contact: Civicon Civil and Project Management Ph:  0418 194 715

63 Adelaide Terrace, East Perth.
Date: 11/06/2018 - 16/06/2018
Time: 0700 - 1900
Type of Works: Footpath closure for landing, propping and stripping bubble deck.
Contact: Hanssen Pty Ltd Ph:  0400 692 900

Wellington Street, Corner of Barrack Street, Intercestion Milligan Street and Corner of Gordon Street, Perth
Date: 11/06/2018 - 01/10/2018
Time: 0700 - 1200
Type of Works: Footpath and road lane closure for billboard works.
Contact: Advanced Traffic Management Ph: 08 9274 6300 

Wellington Street, Corner of Bennett Street, Perth
Date: 11/06/2018 - 15/06/2018
Time: 0700 - 1600
Type of Works: Footpath and road lane closure for removal of existing pavement and hand excavation of tree pits.
Contact: City of Perth Ph: 08 9461 3333 

1322 Hay Street, Perth
Date: 12/06/2018 - 16/06/2018
Time: 0700 - 1530
Type of Works: Footpath closure for painting thebuilding.
Contact: Programmed Ph:  0497 559 929

William Strret and Wellington Street, Perth
Date: 12/06/2018 - 15/06/2018
Time: 1300 - 1700
Type of Works: Footpath closure for fibre splicing between two existing pits.
Contact: Wavelength Ph:  0450 714 446

930 Hay Street, Perth
Date: 12/06/2018 - 13/06/2018
Time: 0700 - 1600
Type of Works: Footpath closure to replace damaged communications pit and reinstating area.
Contact: Site EX Pty Ltd Ph:  0448 844 204

Wellington Street, between William Street and King Street, Perth
Date: 12/06/2018 - 19/06/2018
Time: 0700 - 1800
Type of Works: Footpath closure for minor works to paving and trees.
Contact: Georgiou Ph:  0437 805 163

Unit 3, 27-31 Troode Street, West Perth
Date: 13/06/2018 - 21/06/2018
Time: 0700 - 1530
Type of Works: Footpath closure for painting.
Contact: Perrott Painting Ph:  0437 829 646

63 Adelaide Terrace, East Perth.
Date: 13/06/2018 - 14/07/2018
Time: 0700 - 1900
Type of Works: Footpath closure for bubbledeck and wall lifting.
Contact: Hanssen Pty Ltd Ph:  0400 692 900

1 Parliament Place, Perth
Date: 13/06/2018 - 13/06/2018
Time: 0600 - 1315
Type of Works: A presentation by the Minister for Road Safety and Police.
Contact: DIRKSZ Ph:  0410 055 857

Stirling Street between Roe Street to Newcastle Street, Perth
Date: 13/06/2018 - 13/06/2018
Time: 1000 - 1430
Type of Works: Road lane closure for garden maintenance.
Contact: City of Perth Ph:  0417 955 314

St Georges Terrace, Perth
Date: 14/06/2018 - 14/06/2018
Time: 2100 - 0100
Type of Works: Road lane closure for Coring Asphalt.
Contact: Downer EDI Works Ph:  0427 493 920
Out of hours noise approval has been approved.

659 Murray Street, West Perth
Date: 14/06/2018 - 15/06/2018
Time: 0700 - 1800
Type of Works: Footpath closure to Install comms pit and pipe.
Contact: Diversified services Ph:  0894 942 000

8 James Street, Perth
Date: 15/06/2018 - 15/06/2018
Time: 0700 - 1700
Type of Works: Footpath and road lane closure for Antenna Maintenance- EWP Works.
Contact: Workforce Road Services Ph:  0400 661 326

Macey Street, East Perth
Date: 15/06/2018 - 15/06/2018
Time: 0800 - 1100
Type of Works: Footpath closure for filming.
Contact: Matchbox Ph: 08 9446 8138 

Wellington Square, Wellington Street, East Perth
Date: 15/06/2018 - 15/06/2018
Time: 1100 - 1300
Type of Works: Footpath closure for filming.
Contact: Matchbox Ph: 08 9446 8138 

625 Wellington Street, Perth
Date: 16/06/2018 - 23/06/2018
Time: 0700 - 1700
Type of Works: Footpath closure for EWP Works on Antenna.
Contact: Workforce Road Services Ph:  0400 661 326

525 Wellington Street, Perth
Date: 16/06/2018 - 23/06/2018
Time: 0900 - 1500
Type of Works: Footpath closure for erection of cladding and signage.
Contact: Built Pty Ltd Ph:  0432 605 245

152-158 St Georges Terrace, Perth
Date: 16/06/2018 - 01/07/2018
Time: 0700 - 1800
Type of Works: Footpath closure for erection of a projection structure.
Contact: The Electric Canvas Ph:  0418 643 354

Lot 133-141 Murray Street, Perth.
Date: 16/06/2018 - 17/06/2018
Time: 0700 - 1700
Type of Works: Footpath closure for excavating to open a joint hole.
Contact: Cabling WA Pty Ltd Ph:  0413 432 878

Milligan Street, between Hay Street and Murray Street, Perth
Date: 16/06/2018 - 16/06/2018
Time: 0700 - 1700
Type of Works: Road lane closure for the operation of an Elevated Work Platform to fix porthole.
Contact: Edge Transport Solutions Pty Ltd Ph:  0450 140 314

William Street/ Hay Street, Perth
Date: 18/06/2018 - 19/06/2018
Time: 1900 - 0200
Type of Works: Road lane closure to replace traffic signals.
Contact: Downer Mouchel Electrical Ph:  0419 192 328
Out of hours noise approval has been approved.

Various locations around Perth
Date: 18/06/2018 - 27/07/2018
Time: 0900 - 1700
Type of Works: Footpath closure for sticking pavement decals.
Contact: City of Perth Ph: 08 9461 3490 

Wellington Street, Corner Barrack Steet to Pier Street, Perth
Date: 18/06/2018 - 29/06/2018
Time: 1100 - 1500
Type of Works: Footpath and road lane closure for installation of tree pits nd removal existing pavemnt.
Contact: City of Perth Ph: 08 9461 3490 

Lot 14555 Hackett Drive, Crawley
Date: 19/06/2018 - 19/06/2018
Time: 0700 - 1700
Type of Works: Verge closure for trenching to install new LV cable.
Contact: Cabling WA Pty Ltd Ph:  0413 432 878

130 Royal Street, East Perth
Date: 19/06/2018 - 02/07/2018
Time: 0700 - 1600
Type of Works: Footpath closure for external painting.
Contact: West to West Group Ph:  0424 950 569

The Esplanade & Sherwood Court, Perth.
Date: 20/06/2018 - 20/06/2018
Time: 0700 - 1900
Type of Works: Footpath closure for manual excavation to remove brick and pit installation.
Contact: Cable Layers Australia Pty Ltd Ph: 08 9414 8113